Early testallows for a more efficient design

Discussion in 'Electrical/Telco/Grounding' started by Wireless Estimator, Feb 1, 2008.

  1. Wireless Estimator

    Wireless Estimator Administrator Staff Member

    If a 4-stake soil resistivity measurement was provided ahead of the actual ground system installation, the project engineer would then know which areas have the most conductive soil and at what depth this occurs. The results would be expressed as resistance (in Ohms - cm/m) and would help to determine the ground system's design.

Share This Page