PM pad change creates inspection woes

Discussion in 'Electrical/Telco/Grounding' started by Wireless Estimator, Feb 1, 2008.

  1. Wireless Estimator

    Wireless Estimator Administrator Staff Member

    A project manager had the GC increase the BTS pad an additional 24 to accommodate a new BTS equipment layout requiring the utility frame placement to move 12. Unfortunately, upon an electrical inspection the job was red ticketed because the fence was only 30 from the meter and not the 36 required by code.