The radius of the bend depends upon the conduit size, but a 24” radius is typical for primary service. The National Electric Code (NEC) establishes the minimum requirements for a safe electrical  installation. Because of the varied environments in which electrical equipment is installed, local amendments are often added. Always consult local codes prior to any installation. Also, in some situations service providers willCalculator require a 36” bend radius which will increase your material costs.

The default installation pricing is the cost that a subcontractor will charge to connect and place the PVC conduit sweep in an opened trench while on site. It does not include pulling conductors or any material.

Installation Pricing for Schedule 40 PVC 

90 Degree Sweeps

Nom Pipe Outside Outside Inside Inside Wall Thick- Nom Weight  
Size (in) Dia. (in) Dia. (mm) Dia. (in) Dia. (mm) ness (in) (lbs) Install (ea)
1/2 0.84 21.34 0.62 15.8 0.104 1.6 $4.35
3/4 1.05 26.67 0.82 20.93 0.107 2.1 $4.45
1 1.32 33.4 1.05 26.64 0.126 3.2 $4.55
1-1/4 1.66 42.16 1.38 35.05 0.133 4.3 $4.65
1-1/2 1.9 48.26 1.61 40.89 0.138 5.1 $4.75
2 2.38 60.33 2.07 52.5 0.146 6.8 $4.95
2-1/2 2.88 73.03 2.47 62.71 0.193 1.1 $5.15
3 3.5 88.9 3.07 77.93 0.205 1.4 $5.35
3-1/2 4 101.6 3.55 90.12 0.215 1.7 $5.55
4 4.5 114.3 4.03 102.26 0.225 2 $5.75
               

We recommend that you contact our valued electrical contractors to obtain additional information about their services, capabilities and experience.

 
   
     